Net Zero Carbon Design for New Homes and Buildings
Planning wants net zero, your client wants it to stack up. We model the scheme from the first drawings, so the fabric, heat pumps and PV hit the target without overspending.
What Net Zero Carbon Design Means for Your Scheme
Net zero carbon design means planning a new building so its operational carbon is as close to zero as the site allows, then dealing with what's left. The earlier it's done, the cheaper it is. Fabric, orientation, glazing and roof space get fixed at the first drawings. Change them after planning and it costs you.
"Net zero" means different things depending on who is asking. We work to whichever applies to your scheme:
- London Plan net zero for major schemes (planning).
- The Future Homes and Buildings Standard (building regulations, from 2027).
- The UK Net Zero Carbon Buildings Standard (voluntary, often asked for by investors and larger clients).
London Plan: net zero on major schemes
London Plan Policy SI 2 asks major developments (10 or more homes, or 1,000 m² or more) to be net zero-carbon on regulated emissions. In practice:
- At least 35% carbon reduction on site beyond Part L 2021, following the energy hierarchy (Be Lean, Be Clean, Be Green, Be Seen).
- At least 10% of that from energy efficiency alone on homes, and 15% on non-residential space.
- The rest paid as a carbon offset payment to the borough. The GLA's recommended price is £95 per tonne over 30 years, and many boroughs set their own, often higher, price.
Every tonne saved on site is a tonne you don't pay for. On larger schemes, a better fabric spec or more PV can cost less than the offset it replaces. We run those numbers for you.
Checked 16 November 2026. The draft new London Plan (published 16 July 2026) rewrites the net zero wording. The London Plan 2021 applies until the new plan is adopted, and we check the draft on every London scheme.
Future Homes and Buildings Standard
The new Part L applies to building regulations applications made from 24 March 2027. Applications made before then keep the current rules only if work starts before 24 March 2028. New homes are designed to be zero carbon ready: low-carbon heating, typically a heat pump, a better fabric, and no gas. We run the SAP 10.3 calculations now, so schemes going in next year are designed to the right standard from the start.
UK Net Zero Carbon Buildings Standard
Version 1 was published on 10 March 2026. It is voluntary, but investors, funders and larger clients are starting to ask for it. To claim a building is net zero carbon aligned, it has to meet limits on total energy use per m² (regulated and unregulated), upfront embodied carbon, fossil fuel use on site and refrigerants, and the claim is verified on 12 months of metered data once occupied.
We do the energy side at design stage: modelling the scheme's energy use against the limits, so the design doesn't fall short once it's built. Embodied carbon and the final verification come from other specialists.
How we design it
- Fabric first. U-values, PSI values for the junctions, air permeability and window sizes, tested in the model until the heat demand is low.
- Heating. Heat pumps, communal or individual, or a heat network connection where there's one nearby.
- Renewables. Solar PV sized to the roof, worked out alongside plant space and green roofs.
- Overheating. A well-insulated, airtight building can overheat. We check Part O or TM59 at the same time, so the net zero spec doesn't fail on overheating.
- The gap. What's left after on-site measures, and the carbon offset payment if you're in London.
You get a short net zero strategy with the options compared, the recommended spec, and the figures for the energy statement. Because the same team does the SAP or SBEM, the planning figures match what building control sees later.
What we need from you
- Planning or concept drawings: plans, elevations, sections and the site plan.
- The schedule of accommodation or floor areas.
- Your target: London Plan, Future Homes Standard, UK Net Zero Carbon Buildings Standard, or a client brief.
- The council's pre-app comments or planning condition, if there is one.
- Any M&E strategy or heating preference you already have.
Price and turnaround
No fixed price: it depends on the size of the scheme and how many options you want tested. Send us the drawings for a free quote. Turnaround is 5 working days once we have everything we need.
Need the energy statement, SAP, SBEM or overheating report as well? We use the same models, so we price them together.
Our experience
More than 17 years in energy assessment, with a mechanical engineering background. More than 4,000 SAPs, 2,000 commercial EPCs, 50 energy statements and 50 overheating assessments, on new dwellings, conversions and commercial schemes. We find the affordable, feasible route to the target, not the most expensive spec.
Questions we get asked
Is net zero carbon design the same as an energy statement?
No. Net zero design is the work that sets the spec. The energy statement reports it to planning. We do both, so the figures match.
Can we just pay the carbon offset instead?
No. In London, the 35% on-site saving has to be met first. The offset only covers the gap between that and net zero.
Are net zero homes required now?
Not under building regulations yet. The new Part L, from 24 March 2027, brings in zero carbon ready homes. London major schemes already have to be net zero under the London Plan.
Can you verify a building to the UK Net Zero Carbon Buildings Standard?
No. Verification is done by the standard's verifier once the building has 12 months of data. We design it to meet the energy limits so it gets there.
Related: Decarbonisation feasibility studies, Energy statements, London Plan energy hierarchy, Sustainability statements, Community heating feasibility, Regulation 25A reports, Carbon Reduction Plans, Air Quality Neutral, Urban Greening Factor, Home Energy Model, SAP calculations, SBEM calculations, Solar PV in SAP and SBEM, U-value calculations, PSI values and thermal bridging, Overheating assessments, TM59 dynamic overheating, Air tightness testing, New dwellings, Commercial, Case studies, Industry updates.