Decarbonisation Feasibility Studies for Existing Buildings

Moving off gas, chasing EPC B, or need a heat decarbonisation plan? We model the building, compare the options and give you a clear order of works to net zero.
Illustration of an older office building being upgraded with wall insulation, roof solar panels and a heat pump

What a Decarbonisation Feasibility Study Is

A decarbonisation feasibility study shows how an existing building gets off fossil fuels and down to net zero, and in what order. We model the building as it is, test the realistic options, and tell you what each one does to carbon, energy use and the EPC rating. You get a decarbonisation plan you can budget for, bid for funding with, or hand to your M&E designer.

Who asks for one

  • Commercial landlords facing tighter MEES targets, who need to know what gets the building to EPC B and what it does to carbon at the same time.
  • Schools, NHS sites, councils and other public bodies that need a heat decarbonisation plan for their estate before applying for funding.
  • Housing providers and freeholders with a communal gas boiler that is near the end of its life.
  • Businesses with a net zero commitment, for example in a Carbon Reduction Plan for public sector tenders, who need a credible route for their own buildings.
  • Buyers and investors who want the cost of decarbonising a building known before they commit.

What we look at

  1. The baseline. Energy use and carbon today, from your bills and a model of the building in SBEM, SAP or the EPC software.
  2. Fabric. Roof, wall and floor insulation, glazing and air leakage, with U-values for the build-ups that matter and a condensation risk check where internal insulation is proposed.
  3. Heating and hot water. Air or ground source heat pumps, hybrid systems, and heat network connection where there is one nearby. We check whether the existing radiators and pipework can run at heat pump temperatures.
  4. Renewables. Solar PV sized to the roof and the load, and battery storage where it makes sense.
  5. Controls, lighting and ventilation. The cheap wins, often done first.
  6. The plan. Every measure ranked by carbon saved, effect on the EPC and how disruptive it is, set out as a phased order of works to net zero. We link it to your boiler replacement dates and lease events, so nothing gets ripped out twice.

We look for the affordable, feasible route, not the most expensive spec. Where a measure doesn't pay its way or doesn't fit the building, we say so.

Heat decarbonisation plans for public bodies

A heat decarbonisation plan sets out how a public body will replace fossil fuel heating across its estate. It is usually the first thing a funder asks for.

Checked 16 November 2026. In England, the Public Sector Decarbonisation Scheme is not taking new applications: the government stopped new investment in June 2025, and Phase 4 projects already awarded run to 31 March 2028. No successor scheme has been announced. In Scotland, the Public Sector Heat Decarbonisation Fund is open for Phase 3. Either way, a plan done now means you're ready when the next round opens. See our grants and funding page for what is open now.

What we do, and what we don't

We do the modelling, the options appraisal and the decarbonisation plan. We don't design, supply or install heat pumps, heat networks or solar panels, and we don't do the detailed M&E design. Your M&E engineer or installer takes our plan to detailed design. For solar PV, we can introduce you to a trusted MCS-certified installer. We may receive an introduction fee from the installer.

What we need from you

  • Floor plans, elevations and sections (old drawings or a measured survey are fine).
  • 12 months of gas and electricity bills or half-hourly data.
  • Details of the heating, hot water, cooling and ventilation plant: make, model, age and output.
  • The current EPC or DEC, if there is one.
  • Any planned works, lease dates or boiler replacement dates.
  • Your target: EPC B, net zero by a set year, a funding bid, or all three.

Price and turnaround

No fixed price: it depends on the size of the building and how many options you want tested. Send us the details for a free quote. Turnaround is 5 working days once we have everything we need.

Need the EPC, the EPC B upgrade plan or a Carbon Reduction Plan as well? We use the same model, so we price them together.

Our experience

More than 17 years in energy assessment, with a mechanical engineering background. More than 2,000 commercial EPCs, 4,000 SAPs, 300 TM44 inspections and 150 DECs, on offices, schools, care homes, warehouses and housing. That's a lot of existing buildings modelled, and a good sense of which upgrades actually move the numbers.

Questions we get asked

Is a decarbonisation feasibility study the same as an EPC?
No. An EPC rates the building as it is. The study tests the options to get it to net zero and puts them in order. We often do both from the same model.

Will a heat pump work in our building?
Often yes, but it depends on heat loss, radiator sizes, hot water demand and space for the plant. That's what the study checks. Where it won't work yet, we say what has to change first.

Can we use the study for a funding bid?
Yes. It gives you the baseline, the measures and the carbon savings most funders ask for. Tell us which fund and we'll match the layout to its guidance.

Do you design the heat pump system?
No. We do the feasibility and the plan. Detailed design and installation are for your M&E engineer and installer.

Related: Net zero design, Carbon Reduction Plans, Community heating feasibility, EPC B for commercial buildings, MEES for commercial lettings, Commercial EPCs, Display Energy Certificates, TM44 inspections, Retrofit, Solar PV in SAP and SBEM, U-value calculations, Condensation risk analysis, Energy statements, Sustainability statements, Grants and funding, Commercial, Case studies, Industry updates.

Email your drawings and energy bills or WhatsApp us for a free quote.

Illustration of stepping stones with insulation, heat pump, solar and heat network icons leading to a low-carbon building

Send Us Your Drawings

Email your drawings and energy bills or WhatsApp us for a free quote. Tell us your target (EPC B, net zero by a set year or a funding bid) and we'll tell you what the study needs.